ID 20 Improvement District

Town of Gilbert | Gilbert, Arizona

EPS Group provided construction management services for approximately two miles of new roadway construction consisting of new sewer, water, storm drain, irrigation, concrete, and paving for the Town of Gilbert. The scope included pavement/concrete removal, excavation, subgrade preparation, furnishing and placing aggregate base and asphaltic concrete pavement; constructing curb, gutter, sidewalks, and driveways; pavement marking and signing; furnishing and installing conduit and roadway lighting for traffic signal interconnect system; constructing drainage retention basins, catch basins, and underground storage pipes; irrigation structures and piping, installing new water and sewer facilities, transferring water services and reconnecting supply lines to buildings; and furnishing and installing landscape and landscape irrigation.