Paradise Valley School Speed Analysis

Paradise Valley School District | Paradise Valley, Arizona

EPS Group was selected to conduct an analysis to evaluate the current traffic conditions near an existing charter school and recommend the appropriate posted speed limit signing. EPS Group also developed speed

Waterview Traffic Impact Analysis

Digital rendering of the Waterview Traffic Impact Analysis in Scottsdale, Arizona.

David Evans & Associates / City of Scottsdale | Scottsdale, Arizona

EPS Group conducted a Traffic Impact Analysis for a Downtown Scottsdale mixed-use redevelopment project. Additionally, we evaluated and recommended numerous traffic calming devices on adjacent neighborhood streets to mitigate

Wickenburg Signing and Marking Plans

Town of Wickenburg | Wickenburg, Arizona

EPS Group prepared a recommended signing and marking concept plan to provide a new ADA-compliant crossing along an existing main through route for the Town of Wickenburg.

Hidden Waters North Parkway Feasibility Study

Maricopa Association of Governments | Buckeye, Arizona

EPS Group completed the 28-mile Parkway Feasibility Study within the Maricopa Association of Governments (MAG) Hassayampa Framework study area. This project began at I-10 and extended north to the proposed alignment of the

Wintersburg Parkway Feasibility Study

Maricopa County Department of Transportation | Buckeye, Arizona

EPS Group was selected by MCDOT to complete this 22-mile Corridor Feasibility Study within the MAG Hassayampa Framework Study area. The corridor alignment passed through numerous MPCs (Master Planned Communities) and across

City of Chandler General Plan

City of Chandler | Chandler, Arizona

EPS Group was actively involved in the consensus building effort of the City of Chandler General Plan for a community of more than 236,000 residents. We worked with the team to implement the public

US-70 Salt Creek Emergency Repair

Arizona Department of Transportation | San Carlos, Arizona

Sometime in the Fall of 2006, Salt Creek experienced a major drainage event that crushed most of the 3-15’ diameter corrugated plate pipes intended to pass its flow under US 70. The

Camino De La Canoa Water Line

Farmers Water Company | Sahuarita, Arizona

The project included design and construction documents for 4,000 linear feet of 12-inch water transmission line. The new line provided the water supply for a small stand-alone water system. A Pressure Reducing Valve (PRV)

Farmers Water Company Well E-11A

Farmers Water Co. | Sahuarita, Arizona

EPS Group assisted the water company in converting an irrigation well to a production well for potable water use within the water company. We prepared plans to make the necessary improvements and bring the

Sahuarita Highlands Water Storage Tank

Large, tan water tank.

Farmers Water Co. | Sahuarita, Arizona

The project included design and construction documents for a second 200,000-gallon above-ground welded steel water storage tank. The design included on-site piping, pump selection and layout, water storage, and associated piping, valves, and site