Gilbert Temple

Aerial image of a LDS temple in Gilbert, AZ.

Church of Jesus Christ of Latter-day Saints | Gilbert, Arizona

EPS Group was responsible for providing civil engineering, topographic surveying, ALTA surveying, platting, and construction staking services for the Gilbert Arizona Temple. The 85,000 SF temple is situated on a

Agua Fria Truck Route & Final Design

City of Peoria | Peoria, Arizona

Rose Garden Lane and Beardsley Road previously served as the primary truck route for gravel/concrete trucks leaving mining operations in the Agua Fria River bed. These routes took trucks through residential neighborhoods creating safety,

National Gypsum Industrial Development

Aerial view showing a large plot of land to be a wallboard plant.

National Gypsum | Eloy, Arizona


EPS Group played a crucial role in the industrial development of the National Gypsum wallboard plant in Eloy, Arizona. The plant, which spans over 115 acres between Sunshine Boulevard and La Palma Road, was put

Weaver Street Lift Station

Town of Wickenburg | Wickenburg, Arizona

The Town of Wickenburg, Arizona experienced significant maintenance issues at an existing sewer lift station due to flushable wipes. After a significant effort to educate the citizens to no avail, EPS Group was contracted

Camino De La Canoa Water Line

Farmers Water Company | Sahuarita, Arizona

The project included design and construction documents for 4,000 linear feet of 12-inch water transmission line. The new line provided the water supply for a small stand-alone water system. A Pressure Reducing Valve (PRV)

Magma Dam Flood Retarding Structure

Magma Dam Flood Control District | Pinal County, Arizona

The Magma Flood Retarding Structure (FRS) was originally constructed by the Soil Conservation Service (now the Natural Resources Conservation Service-NRCS) in 1964, and is operated and maintained by the Magma Flood

ID 20 Improvement District

Town of Gilbert | Gilbert, Arizona

EPS Group provided construction management services for approximately two miles of new roadway construction consisting of new sewer, water, storm drain, irrigation, concrete, and paving for the Town of Gilbert. The scope included pavement/concrete

Encore

AV Homes | Mesa, Arizona

Encore at Eastmark Phase II is located south of Encore Phase I, and consists of grading 617 lots and the improving of 314 lots. Grading began in 2015 and exceeded AV Homes’ expectations for completion.

Desert Place

Aerial view of Desert Place in Mesa, Arizona.

Ashton Woods, Lennar, Pulte Homes | Mesa, Arizona

Desert Place is a large residential development located in Mesa, Arizona, at the Southwest corner of Guadalupe and Sossaman Roads within Morrison Ranch. The project was completed in three phases and consists …

Cheyenne Traditional School

a black-based image showing the internal map of the Cheyenne Traditional School.

Scottsdale Unified School District | Scottsdale, Arizona

EPS Group designed a building addition, renovations, parking, and circulation at the existing Scottsdale Unified School District. On the front end of that, the survey group performed a topographic survey utilizing both traditional