Magma Dam Flood Retarding Structure

Magma Dam Flood Control District | Pinal County, Arizona

The Magma Flood Retarding Structure (FRS) was originally constructed by the Soil Conservation Service (now the Natural Resources Conservation Service-NRCS) in 1964, and is operated and maintained by the Magma Flood

ID 20 Improvement District

Town of Gilbert | Gilbert, Arizona

EPS Group provided construction management services for approximately two miles of new roadway construction consisting of new sewer, water, storm drain, irrigation, concrete, and paving for the Town of Gilbert. The scope included pavement/concrete

Northern Parkway Regional Traffic Analysis

Color coded graphic of the Northern Parkway Regional Traffic Analysis in Arizona (statewide).

 Maricopa County Department of Transportation | Arizona (statewide)


EPS Group was chosen by the Maricopa County Department of Transportation (MCDOT) to reevaluate traffic projections in the Northern Parkway DCR (L303 to L101) and determine if they were still suitable for

Barnette Waterline Replacement

Construction vehicles and workers filling in areas of the road that were cut for the new lines.

Town of Wickenburg | Wickenburg, Arizona

This project includes the replacing of existing 4-inch lines with 8-inch lines. Existing fire hydrants were also replaced within the project area, and an 8-inch line was installed on Swilling Avenue between the existing

SR 264 Kinlichee Chapter House Road to Summit Feasibility Study

Arizona Department of Transportation | Window Rock, Arizona

SR 264 is one of the most used highways on the Navajo Nation providing primary access to the Navajo Nation’s capital of Window Rock. This feasibility study was developed to determine a

US-60 Superior Streets Landscape Improvements

Arizona Department of Transportation | Superior, Arizona

The EPS Group landscape architecture team completed the landscape design services for the two-mile urban streetscape section from Queen Creek to South Stone Avenue on each side of the roadway along US 60.

Gilbert and Guadalupe Intersection Landscape Improvements

Town of Gilbert | Gilbert, Arizona

The EPS Group landscape architecture team completed the landscape design services for the Gilbert and Guadalupe intersection improvement. The landscape design consists of providing low water use and colorful desert adaptive planting material. The

Valley Metro Light Rail Gilbert Road Extension

Aerial view of Valley Metro Light Rail Gilbert Road Extension in Mesa, Arizona.

Valley Metro | Mesa, Arizona


EPS Group contributed to the successful completion of several major transportation projects, including the 1.75-mile light rail extension. The project involved a range of complex tasks, including roadway design, drainage design, utility coordination, mapping, and

Globe US-60 Waterline

City of Globe | Globe, Arizona

EPS Group was responsible for the design of 7,000 feet of 8-inch water line. The design included tie-ins to multiple existing facilities, the removal of an existing pressure reducing valve, four concrete box culvert

Scallop Streets

Town of Gilbert | Gilbert, Arizona

Scallops Streets CIP for the Town of Gilbert consists of construction for the full-width roadway improvements at existing county island residential areas to include GuadalupeRoad from Higley Road to 172nd Street; Recker Road from