Town of Wickenburg | Wickenburg, Arizona
This project included the design of approximately 700 lineal feet of a new 8-inch ductile iron pipeline. The pipe was designed to replace an existing 4-inch pipe that was originally installed in the 1940s. …
This project included the design of approximately 700 lineal feet of a new 8-inch ductile iron pipeline. The pipe was designed to replace an existing 4-inch pipe that was originally installed in the 1940s. …
The Farrell Road project runs from Santos Street to Ralston Road that is approximately 1.6 miles of a paved two-lane road. A significant wash, Vekol Wash, runs through the project area. EPS Group is …
EPS Group completed the DCR, EA, and final design for the $55 million grade separation of State Route 347 over the Union Pacific Railroad (UPRR) tracks in historic downtown …
ADOT’s Interstate 40, West Kingman Traffic Interchange (TI) serves as a primary link between Phoenix and Las Vegas, Nevada. …
Arizona Department of Transportation | Douglas, Arizona
EPS Group served as the prime civil engineering consultant for the US 191 Segment V project south of Safford, Arizona. The project added two new Northbound lanes parallel to the existing US-191 roadway …
Town of Queen Creek | Queen Creek, Arizona
EPS Group provided civil engineering, survey, and construction staking services for Ocotillo Road from Recker to Power Road for the Town of Queen Creek, Arizona. The design included a new minor arterial …
EPS Group completed the alignment study and final design of approximately 1.5 miles of new arterial street improvements with raised medians on a “virgin” alignment. Extensive utility coordination was required to resolve conflicts and …
EPS Group was one of three Prime Consultants selected by ADOT to provide final design services for this $42M project on US 60. The project included the design of urban arterial streets and …