Scallop Streets

Town of Gilbert | Gilbert, Arizona

Scallops Streets CIP for the Town of Gilbert consists of construction for the full-width roadway improvements at existing county island residential areas to include GuadalupeRoad from Higley Road to 172nd Street; Recker Road from

Reagan Academy

image taken down a field with a white school in the distance.

Schoolhouse Development | Gilbert, Arizona

EPS Group provided a range of services for the new private charter school project in Gilbert, Arizona. The 49,253 square foot Reagan Academy included playgrounds, basketball courts, play fields, a parking lot, grading and drainage, …

Madison Street Waterline Replacement

A before and after split image of Madison Street.

Town of Wickenburg | Wickenburg, Arizona

This project included the design of approximately 700 lineal feet of a new 8-inch ductile iron pipeline. The pipe was designed to replace an existing 4-inch pipe that was originally installed in the 1940s.

Edison Road Landscape Improvements

City of Maricopa | Maricopa, Arizona

As part of the road improvements along the Edison Road at the industrial park in the City of Maricopa, EPS Group’s landscape architecture team provided landscape architectural design for the approximately 0.8-mile streetscape along

Farrell Road Improvements, Santos Street – Ralston Road

aerial view of newly paved intersection.

Ak-Chin Indian Community | Maricopa, Arizona

The Farrell Road project runs from Santos Street to Ralston Road that is approximately 1.6 miles of a paved two-lane road. A significant wash, Vekol Wash, runs through the project area. EPS Group is

Town of Marana Police Facility

image of a modern building with glass features showing the police facility.

Town of Marana | Marana, Arizona


The new Marana Police Facility is a state-of-the-art building that spans 42,000 square feet and features an indoor shooting range, a gym, a virtual training room, K-9 facilities with kennels, and expanded storage and

Celgene Corporation Renovations

Celgene Corporation | Phoenix, Arizona

The Celgene Corporation entry and site development renovations were designed to enhance the overall identity of the Celgene Corporation. The landscape and hardscape enhancements complement the proposed architecture of the new 40,000 square foot cafeteria

Saguaro Bloom

Entry monument of Saguaro Bloom master-planned community in Marana, Arizona.

DR Horton | Marana, Arizona


Saguaro Bloom is a sprawling, 700-acre master-planned community located in the town of Marana, Arizona. At EPS Group, we were thrilled to provide surveying and engineering services for both preliminary and final platting, as well

Sage Memorial Hospital Master Plan

Razaghi Healthcare | Ganado, Arizona

EPS Group is currently providing civil engineering and landscape architecture masterplanning design services for this state-of-the-art 117-acre medical/healthcare master-planned community on the Navajo Nation in Ganado, Arizona. The plan addresses all design aspects including roadways,

SR 347 UPRR Grade Separation Final Design

Arizona Department of Transportation / City of Maricopa | Maricopa, Arizona

EPS Group completed the DCR, EA, and final design for the $55 million grade separation of State Route 347 over the Union Pacific Railroad (UPRR) tracks in historic downtown