Lindsay Road to Pecos Road
Town of Gilbert | Gilbert, Arizona
EPS Group completed the final design of Lindsay Road from Pecos Road to the SR 202. This six-lane major arterial roadway with raised medians is a critical piece in resolving traffic issues associated with …
Luke Air Force Base Sanitary Sewer Lines
Luke Air Force Base β Sanitary Sewer Lines / System Replacement | Glendale, Arizona
EPS Group was selected for the repair or replacement of 22,230 linear feet of concrete and vitrified clay sanitary sewer mains, laterals and brick manholes that …
Valencia/Kolb Road Intersection Improvement
Valencia Road and Kolb Road Intersection | Tucson, Arizona
This project won the 2019 Metropolitan Pima Alliance Common Ground Award and APWA, Arizona Chapter Southern Branch β 2020 Project of the Year, Transportation (5-25 million range).
The Pima County …
Wickenburg Pedestrian Bridge
Town of Wickenburg | Wickenburg, Arizona
The Wickenburg Pedestrian bridge consists of the conversion of the existing, abandoned ADOT Highway 93 Bridge over the Agua Fria River to a pedestrian and bicycle bridge. Improvements included decorative asphalt overlay, decorative inlays, …
Kingman TI Interim Improvements
Arizona Department of Transportation | Kingman, Arizona
EPS Group provided surveying of the cross sections on the sidewalks to determine the slope, the location of light poles and ramps to determine if they meet ADA requirements, crosswalks, curbs, and gutters, …
Santa Cruz River Shared-Use Path, Phase III
Town of Marana | Marana, Arizona
For this project, which extended the shared-use path along the top of the Santa Cruz River levee by 2.7 miles (from Heritage Park to Beard House), EPS Group prepared the pavement plans, landscape plans, …
83rd Avenue Roadway & Drainage Improvements
City of Peoria | Peoria, Arizona
EPS Group was the prime consultant for the final design of the reconstruction of 83rd Avenue and Butler Drive for the City of Peoria, Arizona. EPS Group designed one mile of new 24βand 66β …
Cottonwood Lane
City of Casa Grande | Casa Grande, Arizona
EPS Group prepared the civil design and construction staking for approximately 2.5 miles of minor arterial roadways with raised medians for the City of Casa Grande, Arizona. This Construction Manager at Risk …
Gilbert and Guadalupe Intersection
Town of Gilbert | Gilbert, Arizona
EPS Group completed the design of this urban arterial intersection widening project. For this CMAR project, we completed an extensive alignment evaluation balancing 69kV power relocations with roadway and right-of-way impacts. In addition to …