Project
Water & Wastewater Master Planning and System Interconnection for WestPark Development.
EPS Group prepared water and wastewater Master Plans to provide service to WestPark Parcel 13, Parcel 14Parcel 18S, Parcel 20S, and an area park for the WestPark development. EPS also provided construction documents for the improvements including an interconnection between the Sundance Water System and the WestPark Water System in the City of Buckeye Water System. It provided a redundant water supply for the WestPark water system. The project included 1.1 miles of 16-inch water line and a 16-inch PRV Station. Services included water line, PRV, telemetry for PRV communication to the City of Buckeye, and pavement replacement. The masterplans utilitized an interconnection between the Sundance Water Campus and the Airport Road Water Campus with a well that was provided at the Airport Water Campus. Other improvements included improvements to WestPark Loop road, including water and wastewater trunk line and temporary interconnections between parcels due to allow a phase construction of these parcel prior to the full build-out of the remaining WestPark development. Construction Phase service was also provided. This project was a unique “out of the box” solution that connected improvements in three separate service areas to provide the water service required for the project.